Medical Device Registration Consultant for India and Global Markets
Your Device Is Ready. Getting It Approved Should Not Take Two Years.
Most CDSCO timelines slip not because the device fails, but because the dossier invites questions. We build submissions that anticipate the query before the reviewer raises it, then carry you through licensing, audits and post-approval obligations.
from Day One
Dossiers
Approval Timelines
Global Ready
Where Indian Regulatory Submissions Lose Time
CDSCO approval is rarely refused outright. It is delayed, one query at a time, until a six-month plan becomes an eighteen-month one. These are the causes we see most often.
The device is classified wrong at the outset
Classification drives the licence type, the authority, the fee, the evidence burden and the timeline. Get it wrong and every downstream document is built on a false foundation. Reclassification mid-process means starting again.
The dossier invites queries it could have prevented
Reviewers raise questions where documentation is thin, inconsistent or silent. Each query cycle adds weeks. A dossier assembled to satisfy a checklist behaves very differently from one assembled to answer a reviewer's likely objections.
The Authorised Indian Agent is chosen commercially
Foreign manufacturers frequently appoint their distributor as agent. The licence then sits in the distributor's name. Changing distributors later means surrendering and reapplying, with all the delay that implies.
Central and State authority routing is confused
Class A and B manufacturing sits with the State Licensing Authority. Class C and D sits with the Central Licensing Authority. Imports are always central. Filing to the wrong authority costs the entire submission window.
Plant and Device Master Files are treated as formality
The PMF and DMF are the substance of the submission, not covering paperwork. Weak master files are the single most common trigger for extended query cycles and for adverse findings during the licensing audit.
The QMS is not audit-ready when the audit arrives
Licensing for Class C and D includes an inspection. Organizations often prepare the dossier thoroughly and the quality system barely at all, then face findings on a system that was never built to be examined.
Test licence requirements are discovered late
Import for demonstration, evaluation, clinical investigation or training requires its own permission. Teams frequently learn this after shipment has been arranged, stranding consignments at port.
Post-approval obligations lapse quietly
Licence renewal windows, change notifications, adverse event reporting and post-market surveillance carry no reminder. Non-compliance surfaces at renewal or inspection, when the remedy is expensive.
CDSCO and the Medical Devices Rules, 2017
Every medical device and IVD placed on the Indian market falls under the Medical Devices Rules, 2017, administered by the Central Drugs Standard Control Organisation under the Drug Controller General of India. Classification determines the licensing authority, the evidence required and the time it takes.
Non-sterile, non-measuring Class A follows a simplified registration route. Sterile or measuring Class A requires a manufacturing licence.
Manufacturing licence required, granted by the State Licensing Authority following documentation review and inspection.
Central licensing with a fuller evidence burden, mandatory audit and typically longer review cycles.
Highest evidence threshold. Clinical data expectations, rigorous master files and central inspection apply.
Import licensing is administered centrally for all classes, regardless of device risk category.
Which Licence Applies to You
The right pathway depends on whether you manufacture, import, distribute or need product for evaluation. We identify the correct route before any application is drafted.
Support Scaled to Your Organization
A start-up filing its first submission and a multi-site manufacturer managing a licence portfolio need very different things from a regulatory partner.
Your Situation
First Submission, No Regulatory Function
The device works. The funding is time-bound. Nobody in the building has taken a product through CDSCO before, and every month of delay is a month of runway.
- No in-house regulatory or quality personnel
- Classification and pathway still uncertain
- QMS either absent or documented on paper only
- Investor or tender timelines driving urgency
- Limited budget for a full-time regulatory hire
How We Engage
- Classification determination and written pathway opinion before spend commits
- Realistic timeline and cost map so funding can be planned against it
- Lean ISO 13485 QMS sized to a small team, not a corporate template
- Full dossier authoring, submission and query handling on your behalf
- Audit preparation and on-site support through the licensing inspection
- Handover briefing so your first regulatory hire inherits a working system
Your Situation
Growing Portfolio, Stretched Team
You hold licences already. One or two people carry regulatory alongside other duties, and each new product or market stretches capacity that is already fully committed.
- Regulatory shared with quality, production or business development
- Existing licences requiring renewal and change management
- New product introductions competing for the same attention
- Export markets opening faster than the team can respond
- Audit readiness slipping between inspection cycles
How We Engage
- Overflow capacity for submissions your team cannot absorb this quarter
- Licence portfolio register with renewal and change-notification tracking
- Dossier review before filing, to intercept queries in advance
- QMS gap assessment and remediation ahead of inspection
- Export pathway planning for EU, US and other target markets
- Training to lift internal capability rather than create dependence
Your Situation
Multi-Site, Multi-Market, Multi-Licence
An established regulatory function exists. The challenge is consistency across sites, visibility across a large licence portfolio, and specialist depth for the submissions that fall outside routine.
- Multiple manufacturing sites with divergent practices
- Large licence portfolio with staggered renewal obligations
- Simultaneous submissions across India, EU, US and other markets
- Post-market surveillance and vigilance obligations at scale
- Internal capability strong in some areas, thin in others
How We Engage
- Specialist support for complex or first-of-kind submissions
- Harmonisation of regulatory practice across sites and business units
- Independent dossier and master file review before filing
- Notified body and regulatory audit preparation across locations
- Post-market surveillance and PSUR system design at portfolio scale
- Structured capability building for internal regulatory teams
Manufacturing, Imports and Exports
Whether you manufacture in India, import into India, or manufacture in India for global markets, the regulatory pathway differs materially. We work across all three.
Manufacturing
Site licensing, plant and device master files, QMS build, licensing inspection support across Class A to D.
Imports
Authorised Indian Agent structuring, import licensing, test licences and consignment clearance support.
Exports
CE marking, US FDA pathways, WHO PQ, free sale and market standing certificates for outbound markets.
Post-Approval
Renewals, change notification, vigilance reporting, PSUR and ongoing compliance maintenance.
Six Areas of Regulatory Support
From the first classification decision through to post-market obligations that continue for the life of the product.
Regulatory Strategy & Approval Pathways
- Product classification and risk assessment
- Market entry strategy: import, manufacturing, contract manufacturing, private labelling
- Approvals across CDSCO, EU MDR 745 and IVDR 746, US FDA 510(k) and PMA, WHO PQ, PMDA, ANVISA, China and Canada
- Regulatory roadmap and timeline planning
Clinical Investigation & Performance Evaluation
- Clinical investigation and performance evaluation plans
- Ethics committee coordination and regulatory submissions
- Clinical data analysis and report compilation
- Regulatory approvals for clinical and performance studies
Technical Documentation & Compliance
- Technical file and dossier preparation
- Site master file and design dossier development
- Performance Evaluation Report support
- Risk assessment documentation
- General Safety and Performance Requirements
- Regulatory labelling compliance
Licence Applications & Approvals
- Manufacturing, import and test licences
- Loan and wholesale licences
- Clinical investigation and performance evaluation approvals
- Query responses and follow-through
- Regulatory certificates: NCC, MSC, FSC
- ICMR product approvals and BIS certification
QMS Compliance & Audit Support
- QMS development and gap analysis: ISO 13485, FDA 21 CFR 820, EHS compliance
- GxP compliance covering GMP, GLP and GDP
- Risk management as per ISO 14971
- Regulatory and notified body audit preparation and support
- Post-audit CAPA support
Post-Market Compliance
- Post-market surveillance and vigilance system implementation
- Adverse event reporting and Periodic Safety Update Reports
- Post-market clinical follow-up
- Change management and licence renewals
- Ongoing compliance support
Global Market Access
Indian manufacturers exporting, and global manufacturers entering India, both need pathways that work in more than one jurisdiction. We plan submissions so that work done for one market carries into the next.
European Union
Technical file and design dossier preparation, CE marking strategy, notified body coordination, Clinical Evaluation Report and Performance Evaluation Report, EU authorised representative guidance.
United States
510(k) premarket notification, PMA support, De Novo pathway, QMSR and 21 CFR 820 compliance, establishment registration and device listing, US agent guidance.
Other Markets
WHO prequalification dossiers, Japan PMDA submissions, Brazil ANVISA registration, Health Canada licensing and China NMPA pathway assessment.
What You Get That You Would Not Otherwise
India Depth, Not India Coverage
CDSCO is our primary practice rather than one line on a global service list. We know how the authorities read a dossier, where queries originate, and what a licensing inspection actually examines.
Regulatory and Quality Together
Submissions fail at the QMS as often as at the dossier. We build both, so the quality system that supports your application is the same one that survives the audit.
Query Anticipation
Dossiers are assembled against likely reviewer objections rather than against a submission checklist. Fewer query cycles is the difference between six months and eighteen.
Senior Attention Throughout
A boutique practice means the person who scoped your submission is the person who writes it. Nothing is delegated down to a junior team after the proposal is signed.
Multi-Market Planning
Work done for CDSCO is structured so it carries into EU MDR, US FDA and WHO PQ submissions rather than being rebuilt from scratch for each market.
Beyond the Approval
Licences require renewal, changes require notification, and vigilance obligations continue for the product life. We build the system that keeps those obligations from lapsing.
Not Sure Which Pathway Applies?
Send us the device and its intended use. We will tell you the likely classification, the licence you need, the authority you file with and a realistic timeline, at no cost.